The general requirements for Bunding and Spill Containment are the bund must be able to contain;
110% of the largest drum stored or 25% of the total volume stored, whichever is the greater
Note: Bunds may be linked with a sump-to-sump drain kit in order to meet holding capacity requirements. Drive over bunding can be used to turn a concrete floor into a bund for larger areas.
|
|
|
| ||||||||
|
|


